Search
Close this search box.

Month: October 2024

When Do Electric Hot Water Units Require a Lockable Isolation Switch and RCD,s?

When Do Electric Hot Water Units Require a Lockable Isolation Switch and RCD,s?

When Do Electric Water Heaters/Hot Water Units Require a Lockable Isolation Switch and RCD? New definition, Heat Pumps not Like for Like with water Heaters! In 2018, the AS/NZS 3000:2018 Electrical Installation “wiring rules” introduced new requirements in Clause 4.8.2.3. For all new installations, an independent, lockable isolation switch must be installed for fixed wired […]

Commercial Gas Appliances  Compliance & Best Practice guide. 

Commercial Gas Appliances  Compliance & Best Practice guide. 

Commercial Gas Appliances  Compliance & Best Practice guide.   Why is there such confusion on navigating through the sea of gas compliance This year Darrel Vecchio complied with the Commercial Gas Appliances, Compliance & Best Practice Guide, in conjunction with other industry experts as mentioned and acknowledged in the document. Drawing from his years of experience in […]

Unlock Your future in Gas Work: start with a Restricted Gas Service Licence ! A pathway to a Full Gasfitting Licence ! Unlock your future in Gas Work start with a Restricted gas service licence !

Unlock Your future in Gas Work: start with a Restricted Gas Service Licence ! A pathway to a Full Gasfitting Licence !

Gas Work Licence – Restricted to Gas Service Only A Pathway to a Full Gas Work Licence  Scope of  Gas Work: Activities Permitted: Service, repair, maintain, fix, disconnect, and reconnect: domestic and commercial gas appliances. Type of Appliances: Type A gas appliances only. Domestic, commercial, gas stoves, cooktops, combi ovens, ovens  gas side of hot water […]

Scroll to Top